Mount Whaleback

whaleback1.jpgProject Details

Location: BHP, Mt Whaleback Operation, Newman.

Value: A$ 2 Million

Date:  Feb 2008 - present (Ongoing)

Client: Savannah Engineers

Address: Lot 2313 Layer St, NEWMAN, WA 6753

Contact: Miro Cecich, Managing Director, Savanna Engineers, Telephone +618 9175 1168

Project Description:
 
Dwyer Engineering and Construction completed all fabrication works associated with the upgrade of Drum B, which is part of a concentrator unit, located at BHP’s Whaleback plant.

The upgrade involved replacement of Drum Sinks and Floats Equipment, followed by replacement of Drum B Separator and Centre Launder, and Drum B Feeders and Feed Preps.

Dwyer Engineering completed all structural and mechanical detailing, supply, fabrication, surface treatment and delivery to site of all components. Specifically, the project involved removal of the existing Humboldt screens, underpans, launders, oversize discharge chutes, walkways, platforms and associated supporting steel work, and installing new screens, underpans, launders, oversize discharge chutes, walkways, platforms and associated supporting steel work.  The underpans are lined with polyutherine/polyurathane, while the launders are lined with 100mm thick ceramic tiles.

Drum B modifications were complete in October 2008, and Drum A is planned to be completed early 2009.